Estimate construction cost (MYR) using Gross Floor Area (GFA), project type, and quality standards for early-stage feasibility studies in Malaysia.
Source: Interactive Construction Cost Feasibility Study Simulator
Tags: construction cost, feasibility study, quantity surveyor, cost estimation, Malaysia, MYR, GFA, project cost, RISM, AACE, construction simulator, Ir. MD Nursyazwi, @mdnursyazwi, Fabrikatur
Friday, 10 October 2025
Interactive Construction Cost Feasibility Study Simulator
Labels:
@mdnursyazwi,
AACE,
construction cost,
construction simulator,
cost estimation,
fabrikatur,
feasibility study,
GFA,
Ir. MD Nursyazwi,
Malaysia,
MYR,
project cost,
quantity surveyor,
RISM
Saturday, 4 October 2025
Interactive Orbital Space Launcher Simulator: Delta-V and Launch Efficiency
Simulate space launches from the Equator vs. the North Pole. Calculate required Delta-V, fuel consumption, and payload capacity using the Tsiolkovsky
Source: Interactive Orbital Space Launcher Simulator: Delta-V and Launch Efficiency
Tags: rocket, orbital mechanics, Delta-V, Tsiolkovsky equation, space simulator, launch efficiency, equator, north pole, physics, education, Ir. MD Nursyazwi, @mdnursyazwi, Fabrikatur
Source: Interactive Orbital Space Launcher Simulator: Delta-V and Launch Efficiency
Tags: rocket, orbital mechanics, Delta-V, Tsiolkovsky equation, space simulator, launch efficiency, equator, north pole, physics, education, Ir. MD Nursyazwi, @mdnursyazwi, Fabrikatur
Labels:
@mdnursyazwi,
Delta-V,
Educational,
equator,
fabrikatur,
Interactive,
Ir. MD Nursyazwi,
launch efficiency,
north pole,
orbital mechanics,
physics,
rocket,
Simulator,
space,
Tsiolkovsky equation
Subscribe to:
Posts (Atom)